This Creek Debris Removal project was another project with an “emergency” situation tagged to it. As we were racing against the encroaching winter which was promising to be a wet one! The county had decided that it was essential to remove the debris from the creek in order for the creek channel to flow and to avoid another disastrous flood as the previous year had delivered. Decades of neglect had our crew pulling out enormous levels of debris. Our crew had to determine where to off-load this pile, being sure the pile would be safe during heavy winter rains, and would be out of the way yet convenient enough to go from creek to “pile”. After determining the location of the debris, the equipment arrived and work began. Our crew worked clean and diligent, and provided a very pleasing end result. Both county inspectors and property owner’s were extremely impressed with the end result. Our crew knows that hard work pays off. This job would ensure a strong flow down the Pacheco Creek, preventing a hazardous situation for flooding may surrounding farm lands.
Project Category: Excavating Projects
Location: Hollister, CA
Customer: PSWD
Details of this project included:
- Road access
- 40 x 40 cu yards of Excavation debris
- Separation of organic and non-organic debris for burning
- 40 cu yard of non-organic debris







